Port of San Diego to Deploy Bonnet System

June 01, 2022

As a national leader in deploying clean air technologies, the Port of San Diego is moving forward with a system to control and capture cargo vessel emissions, also known as a bonnet. The bonnet will be available for use by cargo vessels that aren’t yet equipped to connect to shore power.

In support of the Port’s new Maritime Clean Air Strategy (MCAS), the Board of Port Commissioners has approved an agreement with Clean Air Engineering – Maritime, Inc. (CAEM) to design, build, and operate a barge-based emissions control and capture system, also known as the Marine Exhaust Treatment System (METS), which will be certified by the California Air Resources Board (CARB).

For vessels that aren’t yet shore power compatible, the METS places a bonnet over the vessel’s stack to capture and treat exhaust while the ship is at berth. CARB requires the exhaust treatment to be equivalent to electric power at berth. CAEM has received CARB approval on similar technologies that remove over 95% of particulate matter and nitrogen oxide. Shore power allows vessels to plug-in to shore-based electricity so they don’t have to run their diesel engines while at berth. Having a bonnet in addition to shore power at the Port of San Diego’s cargo terminals – one at the Tenth Avenue Marine Terminal and one coming soon at the National City Marine Terminal – will help to further reduce certain air pollutants like nitrogen oxides and diesel particulate matter.

“The bonnet will give some of our cargo carriers a great option in reducing their air quality impacts while they work to transition their vessels to being shore power compatible,” said Chairman Dan Malcolm, Board of Port Commissioners. “This is another example of how we can maintain and grow our maritime business – and protect jobs – while also improving air quality and quality of life for all who live, work, and play on and around San Diego Bay.”

Nick Tonsich, President of Clean Air Engineering – Maritime added, “The Port of San Diego is aggressively pursuing every mitigation measure available to ensure the highest air quality of any port community. We are proud to work with the Port and provide our years of experience in this public- private partnership.”

The bonnet system supports the Port’s MCAS “Health Equity for All” vision – specifically, the goal to reduce emissions from ocean-going vessels. Additionally, CARB regulations require that auto carrier vessels reduce emissions while at-berth at California seaports beginning in 2025 by utilizing either shore power or bonnet technology. The Port’s National City Marine Terminal primarily processes automobile imports.

The total cost of the project is approximately $11.5 million, with the Port directing $4.9 million in grant funds received from the California Transportation Commission (CTC). CAEM is covering the rest. The bonnet system is anticipated to be operational by January 1, 2025.

CAEM was founded in 2010 and has over eleven years of working experience on over 400 vessel calls and 23,000 hours of vessel exhaust treatment. They are a full-service company providing both design and build as well as operations and maintenance of emissions capture and control systems. They have a successful operational history at the Port of Los Angeles and Long Beach.

The agreement is a good business deal for the Port. CAEM is providing up-front capital financing for the portion of the project not covered by the CTC grant and has agreed to the following:

  1. CAEM will design, build, and deliver to the Port a METS unit which is compliant with CARB regulations;
  2. CAEM will provide the capital necessary for the construction, delivery, and operation of the METS (subject to reimbursement of certain costs through grant funding obtained by the Port);
  3. CAEM will operate and maintain the METS during the duration of the contract through a revenue sharing arrangement with the Port;
  4. The Port’s share of revenue will be applied to reduce the capital investment of CAEM over time; and
  5. CAEM and the Port will jointly own the METS until CAEM has fully recovered its capital investment in the ECCS.

Other notable clean air projects in the works at the Port include:

  • Doubling shore power for cruise ships in fall 2022.
  • Installation in 2023 of two all-electric Konecranes Gottwald Generation 6 Mobile Harbor Cranes to replace the obsolete diesel mobile harbor crane at the Tenth Avenue Marine Terminal.
  • The first all-electric tugboat in the U.S., being built and to be operated by Crowley, will operate in San Diego Bay beginning in 2023.
  • In 2023, 16 new electric trucks and vans will replace gas- or diesel-powered vehicles in the Port’s fleet.

More News

SAN Welcomes Air France Nonstop Service to Paris

October 9, 2026 - CONTACT: Nicole Hall | O: 619.400.2859 | M: 858.531.2863 | E: nhall@san.org San Diego International Airport to Welcome Air France with Nonstop Service to Paris New Route Begins in May 2027 SAN DIEGO, CA — October 8, 2026 – San Diego International Airport (SAN) today welcomed the announcement that Air France will launch nonstop service between San Diego and Paris-Charles de Gaulle Airport (CDG) beginning May 3, 2027. The new service will operate three times weekly on an Airbus A350, connecting San Diego and Paris on Mondays, Wednesdays, and Fridays. Air France will be the eighth international airline serving SAN and will provide travelers with convenient access to Paris and connections throughout Europe and beyond. “We are very pleased to welcome Air France to San Diego,” said Atif Saeed, President and CEO of the San Diego County Regional Airport Authority. “Demand for travel between San Diego and Europe continues to grow, and this new nonstop service to Paris will provide travelers with more convenient access to one of the world’s most popular destinations and connections throughout Europe. It will also strengthen business and economic ties between Southern California and France by expanding opportunities for business travelers and connecting our region more directly with French industries and markets.” The announcement addresses one of SAN’s most significant remaining gaps in its international network. San Diego is the largest U.S. market without nonstop service to Paris, while Paris is SAN’s largest unserved international market. Demand for travel between San Diego and Paris continues to grow, increasing 14 percent this year compared with 2025 and underscoring the strong potential for this new connection. “San Diego is a market with tremendous potential, and we are pleased to build on the growing demand for transatlantic travel and introduce a new direct connection to Paris,” said Nicolas Hénin, SVP of North America, Air France-KLM. “This new route will offer travelers in Southern California even greater choice and convenient access to Paris, Europe and beyond through our global network. This addition reinforces our confidence in the San Diego market and our commitment to expanding connectivity between North America and Europe.” “Having traveled internationally to strengthen San Diego’s relationships with cities around the world, including my recent visit to Paris, I’ve seen firsthand the opportunities these connections can create,” said Mayor Todd Gloria, City of San Diego. “This new nonstop flight is about more than making travel easier. It’s about bringing more visitors to San Diego, supporting our tourism industry, opening doors for local businesses and strengthening our economic ties with France and Europe. I’m grateful to Air France and the San Diego County Regional Airport Authority for recognizing San Diego’s potential and helping connect our city to more opportunities around the world.” The new route will become SAN’s 90th nonstop destination and will bring the airport’s total number of nonstop European destinations to four, joining Amsterdam, London, and Munich. Air France is a member of the SkyTeam Alliance, providing SAN passengers with additional travel options, coordinated schedules, and access to shared benefits across the alliance’s 19 member airlines. For reservations and more information, visit Air France. For information about nonstop destinations and international service from SAN, visit San Diego International Airport’s Nonstop Destinations. **For Air France photos and b-roll, please click here. ** ABOUT SAN DIEGO INTERNATIONAL AIRPORT (SAN) Owned and operated by the San Diego County Regional Airport Authority, San Diego International Airport (SAN) is one of the region’s most important civic assets, serving more than 25 million passengers each year as the community’s gateway to the world and contributing nearly $12 billion annually to the local economy. Conveniently located minutes from Downtown San Diego, SAN is the busiest single-runway airport in North America and the third-largest airport in California, with service to 90 destinations around the globe, including 13 nonstops to Europe, Latin America, Canada, and Asia. In 2025, the Authority opened the first phase of the new Terminal 1, a more efficient facility recently recognized as one of the most beautiful airport terminals in the world. When the new Terminal 1 is fully completed in 2028, it will have generated more than $4.5 billion for San Diego’s economy and created more than 25,000 jobs, paying a total of $2 billion in wages to local workers. The Authority’s continued investment in the airport experience strengthens San Diego’s global competitiveness while delivering lasting value for the community. # # # Read More

SAN Adds Seasonal Nonstop Service to Loreto, MX

October 5, 2026 - CONTACT: Nicole Hall | O: 619.400.2859 | M: 858.531.2863 | E: nhall@san.org San Diego International Airport Adds Seasonal Nonstop Service to Loreto, Mexico Alaska Airlines New Route Marks Airline’s 50th Destination from SAN SAN DIEGO, CA — September 3, 2026 – Alaska Airlines has announced it will launch new seasonal nonstop service between San Diego International Airport (SAN) and Loreto International Airport (LTO) in Mexico, marking the airline’s 50th nonstop destination from SAN. The new service will operate twice weekly on Wednesdays and Saturdays from December 19, 2026, through April 28, 2027. “Alaska’s new service to Loreto will give San Diego travelers another convenient option for international travel and further expand our connections to Mexico,” said Atif Saeed, President and CEO of the San Diego County Regional Airport Authority. “Expanding international service supports our goal of providing travelers with convenient access to destinations around the world.” Loreto will be the third destination in Mexico served nonstop from SAN and the airport’s 12th international destination. SAN will be the fourth U.S. airport with nonstop international service to Loreto. Tickets are available now on alaskaair.com. For more information about San Diego International Airport, please visit san.org. ABOUT SAN DIEGO INTERNATIONAL AIRPORT (SAN) Owned and operated by the San Diego County Regional Airport Authority, San Diego International Airport (SAN) is one of the region’s most important civic assets, serving more than 25 million passengers each year as the community’s gateway to the world and contributing nearly $12 billion annually to the local economy. Conveniently located minutes from Downtown San Diego, SAN is the busiest single-runway airport in North America and the third-largest airport in California, with service to nearly 90 destinations around the globe, including 11 nonstops to Europe, Latin America, Canada, and Asia. In 2025, the Authority opened the first phase of the new Terminal 1, a more efficient facility recently recognized as one of the most beautiful airport terminals in the world. When the new Terminal 1 is fully completed in 2028, it will have generated more than $4.5 billion for San Diego’s economy and created more than 25,000 jobs, paying a total of $2 billion in wages to local workers. The Authority’s continued investment in the airport experience strengthens San Diego’s global competitiveness while delivering lasting value for the community. # # # Read More